User's Manual
ModuLite™ Installation Guide SETUP TESTS
Foxcom Wireless Confidential and Proprietary Information
Document No. 43-93-005-05 X1 19
This section explains the following test procedures:
• Pre RF Test
• Flatness Test
• Gain/IP3 Test
• Uplink Network Test
In order to carry out the tests, the following connections need to be made. (The tests can be
performed on one service or several services simultaneously according to the implemented
application).
Connect the Modular Base Units corresponding with the service optical output to the Modular
Remote Cabinet’s optical input via fiber optic cable.
Connect power to all units being tested (20V-48V DC).
Use the relevant setup test for each Modular Base Unit to each Modular Remote Cabinet.
3.1. Pre RF Test
To carry out the Pre RF Test, the following procedure needs to be carried out.
1. Make sure all DC LED’s are lit on both units.
2. Measure Tx optical output power for all lasers.
3. Output power should be 1.8-3.7dBm (with optical power meter).
4. On the Modular Remote Cabinet, make sure that the optical LED’s is lit on all services.
5. On the Modular Base Units, make sure the Rx optical LED’s are lit.