User Manual
Table Of Contents
- 1 Introduction to the MA-860 System
- 1.1 About MobileAccess MA-860
- 1.2 System Architecture
- 1.3 Distribution of Services in the MA-860
- 1.4 Installation Configurations
- 1.5 Provisioning and Management
- 1.6 Installation and Configuration Workflow
- 2 Element Descriptions
- 3 Infrastructure Preparation
- 4 Installation
- 5 Power-up and Provisioning the Unit
- 6 Appendix
Installation
MobileAccess has also found that mounting the access points in a 19” rack system has proven to
be effective against RF leakage between access points. In this configuration as detailed in the
picture below, two access points can be installed per 19” shelving unit which takes up 1U of
space per two access points.
MA-860 Installation and Configuration Guide 21