User's Manual
Table Of Contents
- Preface Material
- Product Certifications
- Company Certification
- Introduction to the MA-860 System
- Element Descriptions
- Infrastructure Preparation
- Installation
- Power-up and Provisioning the Unit
- Appendix
Introduction to the MA-860 System
MA-860 Installation and Configuration Guide 9
1.7 Installation and Configuration Workflow
The following workflow diagram shows the recommended approach for using this User Manual to
install and provision the system.
Chapter-2 - review the Element
Descriptions.
Chapter-3 - prepare the Infrastructure .
This includes:
• Required power
• Antenna and coax cable layout
Chapter-4. Mount the MA-860
controller according to the type of
installation:
• Stand-alone
• Converged with MA 1000 system
• Converged with MA 2000 system
Chapter-5. Power-up the MA 860 and
provision the system via a local
connection to a computer running the
MA 860 Engineering Tool .
The Provisioning phase is complete .
You may now monitor the system via a
WEB session from any Web Browser.