User's Manual
Table Of Contents
- 1 Introduction to the MA 1000 System
- 1.1 About MobileAccess™ 1000
- 1.2 System Architecture
- 1.3 Configuration Options
- 1.4 MA 410/430 Remote Management
- 2 System Elements
- 3 Site Preparation
- 4 System Installation
- 5 Appendix: System Specifications
System Installation
4.2.1 Rack Installation General Instructions
Verify that the rack height can support all the units to be installed, where you may also want to
consider future expansions.
Figure 13 shows the recommended physical location of the MobileAccess elements in the rack in
order to facilitate and simplify the cabling
connections.
The configuration is for a single operator.
If the site is serviced by more than one operator, each operator often installs their equipment in
a separate rack.
NOTE: Note that the MobileAccess 410/430 controller is at eye level to provide an easy
view of the LED indicators and LCD display and easy access to the local and remote monitoring
connections.
Fiber Optic Patch Panel
and Tray
(variable size)
At eye level
MobileAccess Controller (1U)
MobileAccess Base Unit 1 (1U)
MobileAccess Base Unit 2 (1U)
MobileAccess Base Unit 6 (1U)
MobileAccess RIU (3U)
MobileAccess
Power Supply (3U)
Figure 13: Recommended Order in the Communication Room Rack
MA 1000M Installation and Configuration Guide 20