Installation Guide
Litenna
Installation Guide Installation
Foxcom Wireless Proprietary Information Document No. 42-93-005-23D 25
Table 4 - Fiber Installation Labor List
Labor
Description
Quantity
Comment
Installing splice box +
splicing fibers
Installing the box and opening
fibers at RHU.
92
Installing patch panel
cabinet + splicing fibers
Installation of the box and
opening fibers at base.
92
Installing Foxcom
Wireless equipment
Installing Base Units and
RHUs.
Installing optic cable
(per 1m)
Pull and install optic cable
through building.
Installing coax cable Install cable on floors
Installing electricity ducts
(per 1m)
Install cables through ducts in
building.
If needed
Installing electricity
cables
Install cables through ducts in
building.
System checking and
report.
Trouble shooting and walk
test.
1day
High Rise Installation
In high rise installation all Base Units are placed in the same location. An RHU is
located on every floor. The fiberoptic cable runs from Base Unit to every floor and
terminates at the splice box located near each RHU. From the splice box, the fiberoptic
cable connects to the associated RHU.