User's Manual

Table Of Contents
Corning Restricted - Draft for public release
Physical Installation
CMA-XXX-AEN
Page 29
3.2.2.2 Mounting HX 2.5 GHz TDD in 19-in Rack
Note the following:
The HX 2.5 GHz TDD requires 4U rack height availability
For installations with MA1000/MA2000 remote:
EPM (1U) should be installed beneath the HX 2.5 GHz TDD unit in order to facilitate the connections
2U separation distance between the EPM and the top of the MA1000/MA2000 remote unit is required
Rack nuts and screws not provided (depend on rack type)
To mount the HX 2.5 GHz TDD in a 19-in rack:
1. Determine the location of the HX 2.5 GHz TDD in the rack.
2. Secure the unit to the communication racks’ vertical uprights via at least two bracket holes on each side (one
top and one middle) using the appropriate rack nuts and screws.
Refer to Figure
3-1 and Figure 3-4 for examples of rack installations.
Examples of HX 2.5 GHz TDD Rack Installations with Additional HX4 and MA2000 QX Remotes
Figure 3-1