User's Manual
Corning Optical Communications User Manual I CMA-336-AEN I Page 32
To mount GX Quad-band unit in indoor installation
1. Determine the installation location so that there is enough free space for proper ventilation and maintenance access.
2. Referring to Figure 3-13, disassemble the GX mat and mounting hooks from the GX by unscrewing the relevant bolts,
save those screws for following step.
Figure 3-13.Pre-Mounting Procedure
3. Assemble the top wall rack on the GX using six M6×12 hex socket head cap screws.
4. Assemble the bottom wall rack on the GX using eight M6×12 hex socket head cap screws.
5. Place the GX unit on the Mounting Ground Support with the connectors facing upwards.
6. Secure the GX to the mounting ground support with the two sideboards using eight M6x16 hex socket head cap screws.
.