User's Manual
Table Of Contents
- 1 1Introduction
- 2 2Installation Guidelines
- 3 3System Installation
- 3.1 Selecting GX Dual-Band Mounting Location
- 3.2 Unpacking and Inspection
- 3.3 Additional Required Tools
- 3.4 Required Headend Connections for Deployments with Corning® Optical Network Evolution (ONE™) Solution
- 3.5 Outdoor Concrete Wall-Mountable Installation
- 3.6 Additional Installation Options
- 3.7 GX Connections
- 3.8 Verifying Normal Operation
- 4 4Appendices
Corning Optical Communications User Manual
|
CMA-601-AEN
|
Page 26
•
The GX unit is mounted onto the pole with the connectors
facing downwards.
•
Weight: 147 lb (66 kg); Bracket = 30.9 lb (14 kg).
Package Contents
Check your package contents to verify that the items in the
packing list are included and that there are no signs of external
damage.
Item Quantity
Pole Bracket Top 1
Pole Bracket
Middle
1
Pole Bracket
Bottom
1
M6×16 Hex Socket
Head Cap Screw
(Bracket Assembly)
8
Spring Washer 8
Plain Washer 8
5/8-in Self-Tapping
Screws
(Wood Assembly)
4
GX Wooden Pole-Mountable Bracket Package Contents | Table 3.5
Additional required items (not included)
Item Quantity
5/8-in Screws and Nuts for
wooden pole assembly.
Screws must meet
requirement for related
installation environment.
4
M8×30 Screws for GX
assembly, included in GX
package
2
Electric Screwdriver with
the proper heads
1 -
Electric Drill with
appropriate head
1 -
Spanner (0.31-in for
tightening GX M8 nuts)
1 -
Hex Key 1 -
Additional Required Items | Table 3.6
Figure 3.10 and Figure 3.11 show an overview of a single-mount
and dual-mount GX installation.
Pole-Mountable GX – Single Mount | Figure 3.10