User's Manual
Commissioning the System
P/N 709C011801
Page 74
2. The Adjustment procedure runs through the five process phases where the status is displayed for each process.
Figure 6-30. Running the Adjustment Procedure
3. For failed processes – click the info link in the adjacent column to view the fail status details.
4. Upon successfully completing the Adjustment procedure the user can exit the Setup tool and monitor the system and the
individual ONE™ solution devices through the Config GUI.
5. The balancing procedure will begin and balance each module in the system.
6. Components that have failed the commissioning procedure will be shown in red as FAILED. Click the info button to
determine the reason the component failed (see section 7.1).
6.6 About the Setup Tool
The Setup Tool automates the commissioning procedure for the ONE™ system. The user is prompted to use the Setup Tool upon
one of the following:
• Non-configured module/device discovered
• Non-adjusted module/device discovered
• Erroneous adjustment termination of a module detected
• Adjustment time stamp mismatch between HCM and module information
• User request
The Setup tool consists of 3 main stages:
1. Commissioning – the user assigns RIM modules to pre-defined groups (e.g. indicating carriers), defines zone information
for modules, configures the RF paths for up to three layers (sectors) and RF parameters configuration.
2. Adjustment Procedure – automatic adjustment procedure performed according to the user configuration performed in
previous steps
3. Reports stage – presents the commission process results.