User's Manual
Commissioning the System
P/N 709C011801
Page 69
• For up to 3 groups (Layers 1-3) of services, where each group of services is transmitted only to RAUs connected to OIM
modules assigned to the layer:
o Set the Layer to be configured to On (green)
o Select a RIM module (will appear green)
NOTE: When a RIM-M module is selected the connected RIM module is automatically selected as well. The user must
verify that an RxU is installed before configuring the RF path with a MIMO pair.
o Select one OIM module or more to which the supported RIM service will be transmitted
o Click the Submit button. The configured modules will appear with a blue checkmark.
o Repeat for all RIM modules and additional layers
Figure 6-23. Configuring RF Paths for Layer
• To assign all modules to a single layer, where all RIM module services are transmitted through all of the OIM modules
and to their connected RAU units at the remote sites:
o Select a layer (Layer 1/2/3) in the Set All Modules to field.
o Click the Submit button. An "Are you sure you want to set all modules to layer…". message appears.
o Click OK.
Note the following:
• Only one layer can be configured/displayed at a time.
• Each RIM can be associated to all layers.
• Each RIM can be assigned to more than one OIM
• RIM and OIM modules which have been assigned to each other in a specific layer cannot be assigned to each other in
another layer. For example, if OIM #5, 8 and 9 are assigned to RIM #4 in Layer 1, they cannot be assigned to each
other in Layer 2. Upon selecting either RIM or OIMs the associated modules will be displayed transparently, indicating
unavailability for that layer.
9. Click Next to continue to the Max Input phase.