User's Manual

Table Of Contents
Installation Guidelines CMA-331-AEN Page 58
Draft
4 Installation Guidelines
The following installation assumes that site survey and installation planning (including power requirements) have been
completed. This includes planning the distribution of antennas to provide the required coverage, as well as planning the layout
of the devices and cables in the telecom closet or shaft.
4.1 Infrastructure Preparation
The following installation rules are based on the assumption that the site survey and installation planning (including power
requirements) have been completed.
4.2 Installation Requirements
The infrastructure preparation consists of two main phases:
A.
Floor Planning: Planning the distribution of the Remote Access Units (RAUs) on each floor to provide the required
coverage.
B.
Telecom Closet Planning: Planning the layout of the devices and cables in the telecom closet or shaft. This includes all
cabling and other voice service and digital coverage distribution systems that are relevant to the specific installation.
4.3 Safety Guidelines
Before installing the equipment review the following safety information:
Follow all local safety regulations when installing the equipment.
Only qualified personnel are authorized to install and maintain the Repeater.
Ground specified equipment with the provided grounding bolt
Do not use the grounding bolt to connect external devices.
Follow Electro-Static Discharge (ESD) precautions.
Use low loss cables to connect the antennas