Installation manual

2
630460001
UNPACKING AND INSPECTION
CAUTION: Unit must be lifted by the S/S tower to avoid damage. Do Not lift using valve
housings.
Unpack a Unit as follows:
1. Open carton.
2. Lift Unit from carton.
3. Retain installation manual, and loose shipped parts.
4. Carefully inspect Unit for evidence of damage. If evidence of damage is found, notify delivering carrier and
file a claim against the carrier.
5. Remove loose-shipped parts from carton. Check contents per Table below.
Table 2. Loose-Shipped Parts
90° Drain Elbow
Installation Template
Wire Harness
Power Supply, 115/24 VAC, 75 VA
Valve Decals
Flavor Decals
Installation Manual
LOCATION SELECTION
The Unit may be island-mounted or installed on a front or rear counter provided that the following requirements
are satisfied. A hole must be cut in the countertop to permit access for the water, concentrate, drain tube and
coolant tubing.
WARNING: All electrical wiring must conform to national and local electrical codes.
1. Locate Unit near a grounded electrical outlet having a dedicated circuit fused at jjsr15 amps (slow-blow) for
115VAC units. Alternate protection using an equivalent HACR (US) circuit breaker may be used. The elec-
trical supply for the tower is furnished by a 115/24 transformer which is mounted near the tower.
2. Locate Unit close to a water inlet supply line with pressure and flow as given in the listing of Physical Char-
acteristics and Requirements.
INSTALLATION
CONCENTRATE SOURCE INSTALLATION
IMPORTANT: This instruction does not include instructions for the installation of the concentrate
source system. This should be done to suit the location.