Technical information
Ice Frost Training Manual
Publication Number: TP01080 - 10 - © 2005, IMI Cornelius Inc.
BOWL LOADING OPERATIONS
ICE FROST GENERIC (PRE-MIX)
WARRNING: If the unit runs out of product and is turned off and turned back on without a
new (full) product tank installed the sensor will look for product for 4 minutes. During this 4
minute period CO
2
will be purged from the bowl.
ICE FROST GENERIC (POST-MIX)
• Switch the machine’s main switch to the ON position (1).
• Put the switch (A) into the ON position (1) see FIGURE 11,
switch A. Controls the flow of the product in the bowls.
• The machine’s bowls will now fill up until the maximum level
is reached.
• Continue with start up operations.
FIGURE 11
• Switch the machine’s main switch to the ON position (1).
• Make sure the switch FIGURE 11, Item A is in the OFF
position (0) - (the switch controls the flow of the products in
the bowls).
• Turn mixing motors OFF immediately. Do not run units with
bowls empty.
• Using an 1/8 inch (8 mm) socket wrench, loosen the nut that
holds the post-mix valve.
• Twist nozzle counter-clockwise, lift the post-mix valve up
slightly and turn it towards the outside, leaving nozzle and
coupling attached to the bowl.
FIGURE 12
A
B
A