Instruction manual
4
4 - INSTALLATION
a) Remove the packing binding, then slide the packing off
the machine, lifting it upwards (see fig.1).
b) Checking the machine identification
- after removing the packing, ensure the apparatus you
have received is exactly as ordered, checking the
specifications indicated on the invoice or the delivery
note are the same as those written on the plate.
b) Machine tool kit
On opening the packing, you will find the following set of
equipment inside:
- this instruction manual;
-1 tube of Vaseline to use for the maintenance required
(see paragraph 11.2);
-2 bags, each one containing a drip collector tray;
-1 pressure reduction unit;
-1 CIP (Clean In Place) device.
d) Positioning the apparatus
- make sure the bodywork is positioned in such a way
as to ensure it is aired and avoid installing it near heat
sources. You are advised to maintain a room tempe-
rature of between 15 and 25 °C (fig. 2).
Fig. 1
Important
All the packing element must be kept out of reach of children
as they could represent a safety risk.
Fig. 2