Service manual

Lipton Brewed Iced Tea Training, Installation, & Service Manual
May 7, 2002 - 29 630460171
3. To replenish the sweetener supply, disconnect sweetener line connector form the
empty Bag-in-Box, then connect sweetener line connector to a full box.
FIGURE 4 Bag-In-Box Sweetener System Diagram
FIGURE 5 Sweetener Line & Soldout Switch Inside the Unit
Required Tubing Size:
Standard System Distance -
tanks to dispenser
Tubing Size (i.d.)
1 - 50 ft 1/4 inch
51 - 250 ft 3/8 inch
250 ft 1/2 inch
Plug
16
15