Service manual

Lipton Brewed Iced Tea Training, Installation, & Service Manual
630460171 - 28 May 7, 2002
SWEETENER BIB Installation (General)
1. Adjust sweetener pump CO2 regulator with 100-psi gage to between 45 and 65-
psi (80-psi maximum).
2. Connect Bag-in-Box into the Sweetener system.
3. In the electronic display, scroll to “SET-UP MODE” by using the MENU key.
Open the service menu by pressing and holding the STOP key while pressing the
RINSE key at the same time.
4. Scroll to “SET-UP SWEETENER” then press (#) to enter.
5. Scroll to “UNIT IS SET FOR” screen by pressing (>) key. Toggle the sweetener
valve from OFF (disabled) to ON by pressing the (+) key.
6. Press the (>) key twice to “TEST SWEETENER” screen. Hold the spigot open
do a 10 second sweetener pour. This is used to calibrate the amount of sweetener
to be dispensed during a normal pour sequence.
7. Press the Run key to return to normal operation.
Maintenance
1. Make sure CO2 and syrup supplies are maintained at all times.
2. Remove syrup accumulation form the Bag-in-Box connectors by immersing and
washing them in warm water.
WARNING: To avoid personal injury and/or property
damage, always secure CO2 cylinder in upright position
with a safety chain to prevent it from falling over. Should
valve become accidentally damaged or broken off, CO2
cylinder can cause serious personal injury.
WARNING: CO2 displaces oxygen. Strict attention must be
observed in the prevention of CO2 (carbon dioxide) gas
leaks in the entire CO2 and soft drink system. If a CO2 gas
leak is suspected, particularly in a small area, immediately
ventilate the contaminated area before attempting to repair
the leak. Personnel exposed to high concentration of CO2
gas will experience tremors which are followed rapidly by
loss of consciousness and suffocation.