Operating instructions

Page 18
C
Triton
Clean the couplings on the container for beverage / syrup every time before you attach them. Connect coupling to
container for beverage / syrup. Note: Gray = CO
2,
black = beverage / syrup.
Open the cylinder globe valve on the CO
2
-cylinder and the globe valve on the pressure regulator. Check the CO
2
-
pressure at the pressure regulator. It should be within the following standard values:
Syrup: 3.5 to 4.0 bar
CO
2
carbonization pressure: 3.5 to 4.5 bar
Light product: 0.5 to 1.0 bar
Drinking water: 4.0 to 4.5 bar
Set the CO
2
-pressure by turning the control screw:
Clockwise to increase the pressure
Counter-clockwise to reduce the pressure
Afterwards check the CO
2
-lines for leaks by closing the CO
2
-globe valve. The admission pressure displayed at the
pressure regulator should not drop. If it does, notify the service technician immediately. Do not forget to re-open the
CO
2
-globe valve after the check.
Open the water feed line and check the flow pressure in it. Standard value: 2.0 to 3.0 bar. Set it at the control screw
on the water pressure regulator:
Clockwise to increase the pressure
Counter-clockwise to reduce the pressure
Check the beverage / syrup lines for leaks. Only a visual inspection is possible. If liquid is leaking, call a service
technician.
Close the water feed line. The pressure displayed should not drop. If it does, notify the service technician immediately.
Afterwards, re-open the water feed line.
5.2 Turning On the Device
The water bath must be filled to overflowing with tap water. Refer to the technical data for the amount required. To
prevent algae from forming in the water, add the disinfectant Molco (PN 14-9670-150). The 150 ml container of
disinfectant is sufficient for 30 liters of water.
Insert the mains plug for the cooler into the socket outlet with an earthing contact.
Ice bank controlled units start working after the water bath fills with water and switch off automatically after the ice
bank is built up. The control board of the unit has a time delay for switching on and off the cooling sytem, when it runs
in ice bank mode. After the cooling system is switched on the running time is not less then 5 minutes. Switch off signals
will be ignored during this time. After the cooling system is switched off the break time is not less then 3 minutes.
Switch on signals will be ignored during this time. The break time of 3 minutes is valid for turning on the device and
after a break down of the power supply.
This unit contains a 3-pin icebank probe. Take care that the probe is always correctly adjusted. Wrongly adjusted
probes can be adjusted by using the adjusting device 22-0055-X99.
The agitator motor is a closed version. Temperatures up to 80°C are normal.
The carbonator pump switches on automatically and fills the carbonator container. The carbonator pump switches off
when the water has reached its highest level in the carbonator container but after no more than 20 minutes. Long run
periods are signs of leaks or insufficient water. It is then only possible to turn the pump back on by executing a
network reset (pulling out the mains plug briefly).
Release air from the carbonator container by pulling the safety valve for about 2 to 4 seconds. The circulation pump
has to be switch on manual by using the switch at the leval control board (not Triton 150).
5.3 End of Operation
It is imperative that the CO
2
cylinder and water line be turned off each time operation is ended.