User Manual

5
移动机构
Load connection(M6)
Moving part
Load connection(M3)
Lock knob
Fixed mounting(M6)
Operating temperature: 0~50℃
Environment free of dust, clean, and non-corrosive substances
Relative humidity: <60%
4. Operating Environment
Before installation, first check the safety, such as whether the cable is damaged or broken,
and whether the power supply has grounding protection.
5.1 Installation and announcement
5. Installation and Operation
1. Gently push moving part to moving direction, turn the locking knob to tighten the
moving part.
2. Fix the stage with M6 pan head screws.
3. Turn the screws to leak out the other two fixing holes, and the locking knob is turned to
lock the moving part.
4. Fix the stage with M6 pan head screws.
5. Loosen the locking knob.
6. Install load and tighten properly to ensure positioning accuracy.
7. Connect the cable to corresponding interface of piezo controller according to the label
on the connector.