Owner Manual

STANDARD
INSTALLATION GUIDE
Recommended: non-solvent base fillers, such as all-purpose painter's putty,
high-performance wood filler, plastic wood, etc.
clean with a damp cloth using soap and water
Touch up
Use standard woodworking drills/routers
Care should be taken to avoid frictional heat build-up
Periodic removal of shaving from the drill hole may be necessary
Recommended: Carbide tipped router bits
Drilling or Routing
PVC products do not absorb moisture and can be installed at grade
Moisture
PVC products expand and contract with the change in temperature. Allow 1/8"
spacer per 18' feet at ends for expansion and contraction
Joints between pieces should be glued to eliminate joint separation
Expansions and Contraction
C O R E L A N D S C A P E P R O D U C T S
Spanning
PVC products must not be used in load-bearing applications but are allowed
to be used in spanned applications such as soffit and ceiling with suitable
thickness and support
Storage and Handling
Store on a flat and level surface
Should be handled similar to pine as it has a comparable density but more
flexible
Keep product free of dirt and debris at job site. If the products gets dirty use
warm water with detergent or soap to clean after installation.