Installation & Assembly
Table Of Contents
TOUCH UP
● Recommend non-solvent base fillers such as All Purpose Painter’s Putty,
High Performance Wood Filler, Plastic Wood, etc.
● Clean with a damp cloth using soap and water.
DRILLING AND ROUTING
● Use standard woodworking drills and routers.
● Care should be taken to avoid frictional heat build-up.
● Periodic removal of shaving from the drill hole may be necessary.
● Carbide tipped router bits recommended.
MOISTURE
● PVC products do not absorb moisture and can be installed at grade.
EXPANSION AND CONTRACTION
● PVC products expand and contract with change in temperature. Allow 1/8”
spacer per 18’ feet at ends for expansion and contraction.
● Joints between pieces should be glued to eliminate joint separation.
SPANNING
● PVC products must not be used in load bearing applications but are allowed
to be used in spanned applications such as soffit and ceiling with suitable
thicknesses and support.
STORAGE AND HANDLING
● Store on a flat and level surface.
● Should be handled similar to pine as it has a density comparable to pine but
more flexible.
● Keep product free of dirt and debris at job site. If product gets dirty use warm
water with detergent or soap to clean after installation.
NOTE: Failure to comply with CORE Landscape Products Installation Guideline will result
in voiding of Warranty.
Toll-Free: +1.855.777.2673 (COR
E) | Email: info@corelandscapeproducts.ca
WWW.CORELANDSCAPEPRODUCTS.CA







