User guide
CME 2 User Guide Gain Scheduling
Copley Controls 223
H.2: Set Up the Gain Scheduling Table(s)
H.2.1: Create a Gain Scheduling Table
1
If necessary, Start CME 2 Software (p. 15).
2
On the Main screen, choose AmplifierGain Scheduling.
3
On the Gain Scheduling screen, open the Table tab:
If there is a table stored in amplifier flash, the screen will show it as in this sample:
Continued…