Service manual

GE MEDICAL SYSTEMS
D
IRECTION 2300749-100, REVISION 2LOGIQ
TM
3 SERVICE MANUAL
Chapter 3 3-9
Section 3-3
Preparing for Installation
3-3-1 Verify Customer Order
Compare items received by the customer to that which is listed on the delivery order. Report any items
that are missing, back ordered or damaged.
3-3-2 Physical Inspection
3-3-2-1 Systems Voltage Settings
Verify that the recieved scanner is set to the correct voltage.
The Voltage ratings for the LOGIQ™ 3 Scanner is found on Rating label near the Circuit Breaker at the
rear of the system
3-3-2-2 Video Formats
Check that the video format is set to the locally used video standard, NTSC or PAL.This can be done
in the Utilities menu.(Refer to Chapter 16 of the Basic Users Manual for the procedure for changinh the
settings)
3-3-3 EMI Protection
This unit has been designed to minimize the effects of Electo-Magnetic Interference (EMI). Many of the
covers, shields, and screws are provided primarily to protect the system from image artifacts caused by
this interference. For this reason, it is imperative that all covers and hardware are installed and secured
before the unit is put into operation.
3-3-4 Checking the Components
When a new system arrives, check that nonne of the components are damaged or in short supply. If
shipping damage or shortage occurs, contact the address shown in Chapter 1.
WARNINGWARNING
CONNECTING A LOGIQ™ 3 SCANNER TO THE WRONG VOLTAGE LEVEL WILL
MOST LIKELY DESTROY THE SCANNER.
CAUTION
If the Power Plug is Modified or replaced to Suit the local Conditions and regulations, Ground
continuity check should be performed between Ground Pin on the Plug and the Metal Part on
the LOGIQ™ 3. Refer Section 10-7-4 for more details.