Service manual

GE MEDICAL SYSTEMS
D
IRECTION 2300749-100, REVISION 2LOGIQ
TM
3 SERVICE MANUAL
Chapter 3 3-3
Section 3-2
Receiving and Unpacking LOGIQ™ 3
When a new system arrives, ensure that none of the components are damaged or in short supply. If
shipping damage or shortage occurs, contact the address shown in Chapter 1.
The Packaging/Unpacking Procedure.
Topics discussed in the Packaging/Unpacking Procedure:
1.) Check the Shipment,
2.) Unpack the Unit,
3.) Handling Incomplete or Damaged Shipment
Please read these procedures before packing/unpacking the LOGIQ™ 3.
We strongly advice you to store the LOGIQ™ 3 packing material in undamaged condition in case of
future transportation.
1.) Cut the two Metal Bands.
CAUTION
Do not lift the unit by the Keyboard. This may cause equipment damage.
CAUTION
The crate with the LOGIQ™ 3 weighs approximately 195 kg. Be prepared for a sudden shift of
weight as the unit is removed from its base (pallet).
CAUTION
Inspect the Sochwatch and tge Tiltwatch. Ensure that they are not fused. (Refer to the
instructions attached on the packing Box on howto check the Shockwatch and Tiltwatch)
Figure 3-1 Cutting the two metal bands.