Service manual
GE MEDICAL SYSTEMS
D
IRECTION 2300749-100, REVISION 2 LOGIQ
TM
3 SERVICE MANUAL
4-2 Section 4-3 - General Procedure
Section 4-3
General Procedure
4-3-1 Power On/Boot Up
NOTE: After turning off the system, wait at least ten seconds before turning it on again. The system
may not be able to boot if power is recycled too quickly.
4-3-1-1 Scanner Power On
1.) Connect the Main Power Cable at the rear of the System
2.) Ensure the retainer clamp slips securely over the shoulders on the molded plug.
3.) Connect the Main Power cable to an appropriate mains power outlet.
4.) Switch ON the Main Circuit Breaker at the rear of the System.
CAUTION
SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place. The
covers are required for safe operation, good system performance and cooling purposes.
NOTICE
Lockout/Tagout Requirements (For USA only)
Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the Power Cable
on the system.
WARNINGWARNING
Protective earth must be taken care when connecting AC power cable without its plug
to wall outlet.
Signed
Date
TA G
&
LOCKOUT