Technical Data Bulletin
Copper Sealtite 2000 07 65 13 - 5
J. Other Areas: Install flashing at other locations in accordance with manufacturer’s instructions.
K. Joining of Material:
1. Make joint by lapping a minimum of 4 inches and coating contact surfaces with sealant.
2. Install flashing with minimum number of lap joints.
L. Weep Holes:
1. Install flashing through masonry with proper drainage to outside.
2. Provide weep holes in head joint, with first course immediately above flashing.
3. Keep weep holes free of mortar droppings.
M. Mortar Deflection: Install mortar deflection device at flashing locations to ensure proper
weepage.
3.4 FIELD QUALITY CONTROL
A. Inspection: Verify flashing has been properly installed at required locations to prevent water
penetration.
Specifier Notes: Delete the water test if not required.
B. Water Test:
Specifier Notes: Edit the following sentence.
1. Water test flashing at [a minimum of 3 locations in each area where flashing has been
installed] [locations designated by Architect].
2. Leave wall joint above flashing clean of mortar at each test location.
3. Force water into openings to determine if flashing has been properly installed and weep
holes provided as specified.
4. Report water test results to Architect.
C. Trim flashing left exposed to exterior flush with masonry after inspection [and water test].
3.5 PROTECTION
A. Protect installed flashing from damage during construction.
END OF SECTION