Installation Manual

Step 9.
Install shear bolt connector
ote:N Refer to the separate installation instructions
supplied with the shear bolt connector.
If the lug is supplied with centering sleeves, check the
chart supplied with the lug and determine if a sleeve is
required and what the correct color would be.
Wire brush conductor (aluminum only).
Immediately insert the conductor completely into the
barrel of the lug and rotate connector to distribute
inhibitor.
Align flats of connector and apparatus bushing for
minimum conductor strain.
ote:N Connector must be fully seated on cable conductor.
With an Allen hex key as specified in Table 1 screw in bolt
No. 1 until it breaks off smoothly. Proceed with bolt No.
2 in a similar way. If the lug has more than two (2) bolts,
continue with bolt No. 3 and bolt No. 4, (not shown in
Figure 11). See Figure 11 for tightening sequences.
Once all the bolts have broken off, smooth any rough
edges with a file and install the covering caps. Carefully
clean off any filings.
Wipe excess inhibitor from connector and adapter
surfaces.
Step 10.
Check di men sions
Check length from end of com pres sion con nec tor to top
of cable adapter.
Length should be no longer than “E” dimension. (Re fer to
Fig ure 12 and Table 1.)
Install BOL-T T-body with mating parts
Step 11.
Install DT625 T-body
Clean and lubricate outside of cable adapter with lubricant
supplied.
Clean and lubricate inside of T-body with lubricant sup-
plied.
ote:N If test point T-body is used, insure test point is
opposite front plate side of T-body.
Without moving the cable adapter, slide T-body onto cable
adapter until compression connector eye is centered in
600 A interfaces. (Refer to Figure 13.)
ote:N The end of the cable adapter must line up with
the top edge of the tape marker after T-body
assembly. Refer to Figure 10.
Remove tape marker from cable.
Go to Step 12, page 11 to complete T-body termination.
Figure 12. Line illustration for dimensional check.
Shear Bolt Connector
"E"
See Table 1
Tape Marker
Cable Adapter
Concentric Neutral
Wires
Figure 13. Line illustration of BOL-T T-body installation.
T-body
Cable Adapter
Tape Marker
Concentric Neutral Wires
Lubricate
600 A Interfaces
Apparatus
Bushing
Test Point on Accessible Side
6
600 A 15/25 kV class DT625 T-body installation and cable preparation instructions S600-46-2 July 2014 www.cooperpower.com