User's Manual

Users Manual Cooler Manager Cool Beer DOO
7 | P a g e
7
3.0 GETTING STARTED
Getting Started section explains how to start using Cooler Manager device.
3.1 Installation of Cooler Manager Device to the Place of Sale
o Step One: Cut the beer line where you want to measure beer flow.
o Step Two: Attach Flow Sensor to the lines. Just plug it in the fast connection.
o Step Three: Attach connector from Flow Sensor to the Cooler Manager
controller.
o Step Four: Attach the power cable cord to the Cooler Manager controller.
o Step Five: Close the cover of Cooler Manager box. Make sure it is closed.
o Step Six: Power on the power supply.
o Step Seven: Now, you should see the numbers on the LCD screen. Insert the SIM
card or SD card in dedicated slots if needed. This is optional.
o Step Eight: Measuring can start.
3.2 CoolMan Application
If needed, user can set up precision factor or Brand trough smartphone application.
Log-In to the smartphone app with your credentials.
Credentials are provided by your company. If you do not have them, you cant access the Cooler
Manager controller.