Specifications

MCD3000 Series
46 MG.15.A4.22 - VLT is a registered Danfoss trademark
Fault Procedure
Disconnect the incoming supply (L1, L2, L3 and
control voltage) from the starter.
Disconnect the motor cables (T1, T2,T3) from the
starter.
Ensure the firing looms remain plugged in during
the tests.
Using a 500 VDC insulation tester (low voltage
ohm meters or multi-meters are not adequate),
measure the resistance between the input and
output on each phase (L1-T1, L2-T2, L3-T3). The
resistance should be close to 33k
.
If the resistance measured across the SCR
measures below about 10k
the SCR should be
replaced.
If the resistance measured across the SCR is
greater than 33k
there could be a control PCB
or firing loom fault.
CONTROL INPUT TEST;
This procedure verifies the integrity of circuits
connected to any of the remote control inputs. Start,
Stop, Reset and Par. Set.
Using a volt meter measure across each input. If
24VDC is measured when the circuit is closed, the
switch/control is connected incorrectly or is faulty.