User manual
173
Chapter 6: Maintenance
• Firmware Update (page 174)
• Replace Power Supply (page 179)
• Replace Cooling Unit Fan (page 180)
• Replace Cache Battery (page 185)
• Replace SEP (page 187)
• Replace RAID Controller (page 188)
This Chapter covers the maintenance procedures for VTrak.
The power supplies, cooling unit fans and the cache battery are hot-swappable
field-replaceable components.
The Storage Enclosure Processor (SEP) and RAID Controller are field-
replaceable but they require you to power down the VTrak.
Figure 1. Field Replaceable Units (FRUs) on VTrak
The primary means to identify and diagnose problems on VTrak is to observe and
interpret LED colors. A discussion of this process is found on the next two pages.
All hot-swappable components can be fully diagnosed with LEDs, although the
Command Line Utility (CLU) and WebPAM each offer you additional help to make
and confirm your diagnosis. See page 205 additional information.
iSC SI 1iSC SI 2Mgmt
IOIOI
PROMISE
TECHNOLOGY, I NC.
VTrak 15200 Controller
Storage Enclosure
Processor (SEP)
RAID Controller
Power Supply 1 Cooling Unit 1
with Battery
Power Supply 2Cooling Unit 2