Specifications
1-6
Cisco ONS 15200 Maintenance Manager Installation and Operations Guide
78-13764-01
Chapter 1 Installation
Connecting to the ONS 15200 System
Figure 1-6 CIM MA connector on the MCU
Step 3
Connect the DB-9 connector at the end of the MA CAN cable to the DB-9 connector at the end of the
DRV CAN cable. The DRV CAN cable is the black cable with the large cylindrical component in the
middle.
Step 4 On the laptop, connect the DRV CAN cable to the port labelled “1” located on the left side of the CAN
board. Figure 1-7 illustrates the completed connection.
NCB
MMC
MA
INT
BUS
Side
View
Front
View
Network
Control
Module
Communication
Interface
Module
Communication
Interface
Module
Connect Maintenance
Manager Here
54818