Manual
Gate Bracket and Chain Installation
Revision D Installation 1-15
R
EAR
I
NSTALLATION
Figure 1-20.
OPEN
OPEN
Chain motion
Location of target on a rear installation
with the gate in full CLOSE position.
See Figure 1-7 to view a rear
installation for a left hand gate.
Position of the
target magnet
when the gate
is fully closed.