Owner manual

5
OPERATOR INSTALLATION
+
+
With gate closed, mark the center of the gate.
Lift gate to open position and mark the center point of the gate for the operator on the ceiling.
Note: Make sure the gate hardware is well balanced and the gate opens and closes smoothly.