T5-ETL T7-ETL 12 VOLT DC Swing Gate Operator INSTALLATION MANUAL 7/10
CONTENTS IMPORTANT SAFETY INSTRUCTIONS ............................................................. 3 Applications ................................................................................................... ..... 4 Pre-Installation Checklist .................................................................................. 5 Operator Components ....................................................................................... 6 Pivot Arm Installation……………………………………………………………..….
IMPORTANT SAFETY INSTRUCTIONS WARNING - To reduce the risk of injury or death: READ AND FOLLOW ALL INSTRUCTIONS. Installation should be performed by a professional installer. Should electricity be required, use a certified electrician only. Any device that requires 120 Volts AC should be U.L. approved. Install control devices such as keypads far enough away (5 feet or further) from any moving parts of the operator and gate to prevent possible injury.
APPLICATIONS The Toona Swing Gate Operator is designed to handle a swing gate up to 14 feet (T5-ETL) and 20 feet (T7-ETL) in total length. Apollo Operators are available only through qualified dealers with an outstanding reputation in the fence and gate industry. These dealers will be able to recommend the proper equipment for particular applications. Apollo Operators are 12 Volt DC (Direct Current) powered.
PRE-INSTALLATION CHECKLIST The following checklist should be used before beginning installation: Verify that the proper operator has been selected for this application. Determine the general location of the operator, access controls, and solar panel (if used). 1. Is there a suitable location for the operator? 2.Can the solar panel (if used) be mounted in an unobstructed area facing south? 3.
OPERATOR COMPONENTS 5 2 pieces Toona 5 TO5012 Toona 7 TO7012 g f a b c d e f g h i j Actuator Gate attach bracket (two pieces) Pivot bracket Mounting Hardware Release lock keys Control Box Cable Harness Caution signs (2) Battery Charger (optional) Solar Panel (optional) i h j 6
TOONA 5/7 Pivot Arm position is measured from the center of the gate A B Toona 5 7-1/16” 7-1/16” Toona 7 7-3/4” 7-3/4” These dimensions are for 4” post with hinge in center. Adjust accordingly if post size or hinge location varies. A & B should always be same value. Pull to open installation shown here. For push to open installation see page 22.
TOONA 5 F= 1.
Toona 5/7 3.9” max Limit Switch Adjustment Loosen nuts and adjust limits. Retighten nuts. (Nuts may be hex or socket.
T5-ETL Actuator Wiring T7-ETL Limit Wires The limit wires (orange and white) are reversed on the T7-ETL from the picture shown.
BATTERY CONNECTIONS If a electrical battery charger will be used, a 12 volt sealed lead acid battery rated for 33 ampere hour or more is recommended for the Toona 5 & 7. A 1.5 amp automatic battery charger is sufficient for most applications The battery may also be recharged with a solar panel. If solar charging is a requirement refer to page 4 or contact our customer service department at 800 226-0178 to help determine the solar panel size needed.
TOONA Wiring Diagram GND YELLOW YELLOW BLUE BLACK RED SIREN ACTUATOR CABLE 13
4.5” 38” 4.125” 47.25” 5” 5.
PROGRAMMING CURRENT SENSING The 835/836 control boards incorporate a safety feature that will put the operator into a hard shutdown mode if the control board detects a current sense two consecutive times during a cycle. This hard shutdown condition may be reset by shorting the FIREBOX or UL inputs on the left side of the control board to ground. This condition may also be reset by pressing the HARD SHUTDOWN RESET button located toward the upper right hand corner of the control board.
835/836 Control Board Parts Identification Program Switches Timer To Close Dual Gate Delay Current Sensitivity Adjustments Microprocessor Hard Shutdown Reset Operate Push Button Remote Monitor Outputs Optional Device Inputs LED Enable & Learn Mode Push Button Stop Circuit Jumper Control Board Reset Fire & ETL Inputs Optional Device Input Emergency Bypass Operator Connector (Slave) Reverse Battery Polarity Indicators Operator Connector (Master) 16
Master/Slave Connector Board Harness Function Pin 1 Pin 2 Pin 3 Pin 4 Pin 5 Pin 6 Pin 7 Pin 8 Open Limit Close Limit Motor (positive on open, negative on close) Motor (negative on open, positive on close) Common for both limit switches Encoder Input from EIB module Battery Negative Battery Positive 7 5 8 3 6 1 4 2 Orange White Black Red Green Yellow Black Red EMERGENCY BYPASS Applies battery voltage directly to motor to open gate (will not close gate) if control board fails.
Adjustments TIMER TO CLOSE closes Adjusts time before gate automatically Adjustable 5 to 70 seconds. DUAL GATE DELAY (Dual board only) Adjusts delay between master and slave operation 0-4 seconds (836 only with magnetic, solenoid, and other locking devices) CURRENT SENSITIVITY Increases or decreases the Auto Reverse sensitivity. Push Buttons OPERATE When depressed, activates the gate. Used for initial installation and testing.
Program Switches OFF ON 1 TIMER TO CLOSE Gate does not automatically close. Gate automatically closes. 2 TIMER TO CLOSE OPT. Gate automatically closes from any position after opening. Gate automatically closes only when completely open (open limit engaged). 3 SLAVE DISABLE Enables slave side (dual gate use). Disables slave side. (single gate use) 4 SIREN DELAY Siren (optional) active when gate is moving. Siren (optional) starts 5 seconds before gate moves. 5 OPEN/CLOSE INPUT OPT.
Optional Device Inputs GND Supplied Battery Ground INP Activate Gate (Push button activation when momentarily shorted to ground) 12V Supplied Battery Voltage (Protected with 3 Amp fuse) GND Supplied Battery Ground INP Activate Gate (Push button activation when momentarily shorted to ground) 12V Supplied Battery Voltage (Protected with 3 Amp fuse) EDGE Reverse edge input. When grounded, will stop and reverse gate if closing, resets close timer if gate is open. EDGE Reverse edge input.
APOLLO Gate Operators, Inc. 911 Siren The 911 Siren is included with all Apollo ETL Gate Operators. Mount siren in an area that will produce maximum performance (additional wire may be required). Connect the red wire to the SIREN connector on the Remote Monitor Output Connector block. Connect the black wire to the GND connector on the Remote Monitor Output Connector block. Red Black Set Program Switch # 4 as preferred: ON - Upon activation, Siren will start for 5 seconds before gate(s) begin moving.
PUSH TO OPEN APPLICATION 22
APOLLO Gate Operators RECEIVER OPTIONS Do not confuse the receiver code switches with the red program switches on the gate control board. Never set all code switches to the same position. Transmitters must match code switches for proper operation.
SPECIFICATIONS Supply Voltage ……………………………………………….. 12VDC Recommended Battery (electrically charged) .………..….. 12 V, 33aH (or larger) Sealed Lead Acid Recommended Battery (solar charged) …………………… 12 V, 105 aH Battery Charger ………………………………………………. 1.5 or 6 amp Automatic Recommended Solar Panel ………………………………… 5 watt minimum Duty Cycle …………………………………………………….. Continuous Operating Temperature ……………………………………… –400F - +1500F Current Draw Standby (with no accessories).…………….
APOLLO Gate Operators, Inc. LIMITED TWO-YEAR WARRANTY Apollo Gate Operators are warranted against defects for a period of 24 months from the date of purchase, providing recommended installation procedures are followed.