Owner manual

CONCRETE PAD FOR SL-100
24”
9½”
24”
10”
RED HEAD BOLTS
½X3½FOUR PLACES
Area for conduit(s)
Operator concrete pad
Operator frame
Operator plastic cover
GATE TRACK GATE
GATE TRACK
FOOTING
GATE TRACK
FOOTING
Minimum 5”
10”
8”
24”
4”
6.5”
When possible
Install 4” above
Ground
Footing for
Gate operator
Drive chain level
9