GATE OPER AT MATIC O RS O T AU ® SLI S DER EAD H S • SW R INGERS • OVE SL-150 SL-100 Instruction Manual Instructivo de instalación para operadores corredizos ® US L I STED UL325 compliant UL991 compliant Copyright 2005 all-o-matic inc. www.allomatic.net C WWW.ALLOMATIC.
TABLE OF CONTENTS Important safety instructions............................................................. 3 Different UL 325 class types........................................................ 5&7 Concrete pad installation for SL-100................................................ 9 Concrete pad installation for SL-150................................................11 Different installation types (front & rear mounts).......................... 13 Gate travel adjustment...................................
IMPORTANT SAFETY INSTRUCTIONS WARNING To reduce the risk of injury: READ THE FOLLOWING DIRECTIONS. DO NOT EVEN THINK OF STARTING UNTIL YOU HAVE READ AND UNDERSTAND THESE DIRECTIONS. IF THERE IS SOMETHING YOU DO NOT UNDERSTAND CALL US. Never let children operate or play with gate controls. Keep the remote control away from children. Always keep people and objects away from the gate. No one should cross the path of the moving gate. This operator must be tested monthly.
INSTALL THE GATE OPERATOR ONLY WHEN YOU HAVE READ THE FOLLOWING: *Confirm that the gate operator being installed is appropriate for the application. *Confirm that the gate is designed and built according to current published industry standards. *Confirm that all appropriate safety features and safety accessory devices are being incorporated, including both primary and secondary entrapment protection devices. *Make sure that the gate works freely before installing the operator.
DIFFERENT UL 325 CLASS TYPES Class one: Residential A vehicle gate operator intended for use at a home of one to four single family dwellings, garages or parking area. Class Two: Commercial or General Public Access A vehicular gate operator intended for use at a commercial location or building such as a multi-family housing unit (five or more single family units), hotel, garages, retail stores, other buildings servicing the general public.
CONCRETE PAD FOR SL-100 GATE TRACK FOOTING GATE TRACK GATE 10” Minimum 5” RED HEAD BOLTS FOUR PLACES ½”X 3 ½” Operator plastic cover 10” 24” Area for conduit(s) Operator frame Operator concrete pad 9½” 24” Drive chain level When possible Install 4” above Ground 6.
CONCRETE PAD FOR SL-150 GATE TRACK FOOTING GATE TRACK GATE 10” Minimum 5” FOUR RED HEAD BOLTS ½”X 3 ½” 7.5” 24” Area for conduit(s) 16.
DIFFERENT OPERATOR INSTALLS Gate in open position A front mount installation and chain layout Gate closed Gate operator Operator footing Track footing Overhead View DRIVEWAY Track footing Gate in open position Gate operator Operator footing Operator footing Rear mount installation and chain layout Gate closed See blow out below Track footing DRIVEWAY Operator footing Move one idler to bottom center hole and follow chain path as shown.
GATE TRAVEL ADJUSTMENT FOR SL-100 Locate limit switches Step 1: Turn the power off on operator. Step 2: Push limit lock plate down. Turn limit nut with your fingers in direction Step 3: Place limit plate to its locked position. Step 4: Turn the operator back on. Step 5: Run gate operator. If more adjusting is needed, repeat the steps. the desired Limit nuts Gear Box Each notch equals about ½” of travel.
GATE TRAVEL ADJUSTMENT FOR SL-150 Locate limit switch box. Step 1: Turn the power off on operator. Step 2: Use a screw driver to pull limit lock plate outwards. Turn Limit nut to desired direction. Step 3: Place limit plate to its locked position. Step 4: Turn the operator back on. Step 5: Run gate operator. If more adjustment is needed, repeat the steps. Limit switch Each notch equals about ½” of gate travel.
LEFT HAND OPENING SETTINGS 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON ON 514 GDE For left hand opening set the four wires as shown below. C-LIMIT = Blue wire MOT-CLOSE = Blue wire O-LIMIT = Red wire MOT-OPEN = Red wire Opening This is a left hand opening from inside the property.
RIGHT HAND OPENING SETTINGS 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON ON 514 GDE For right hand opening set the four wires as shown below.
ELECTRICAL CONNECTION OPERATORS MUST BE PROPERLY GROUNDED! Power switch and electrical connection box. OFF X X OFF For power wires enclosure use UL listed conduits. Connect black wire to 115 volts AC = Hot. For power, a minimum of a 20-Amp dedicated circuit breaker is needed. Connect white wire to AC = Neutral. Connect ground wire to operator metal frame. Use a proper ground rod for a ground reference. Use the shortest and thickest wire possible for ground.
NORMAL LOOP LAYOUT 8 FT WIRED IN SERIES SAFETY LOOP 4 FT OUT TWISTED 6 TURNS PER FOOT 1 1/2 IN 4 FT SAFETY LOOP EXIT LOOP 4 FT GATE OPERATOR 1/4 IN 8 FT GATE 4 FT 4 FT GATE TRACK WHEN USED This is a normal loop layout. Remember when connecting to an All-O-Matic circuit board you use the normally closed contacts for your safety loop detector and normally open contacts from the exit loop.
ACCESSORY CONNECTIONS C C 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON ON 514 GDE The circuit board 24-VAC output provides up to 700 mAmps of power for accessories. More than two or three accessories will require a separate power supply. Remove black jumper from SAFETY when a safety device is installed. Power Detect 2 1 0 1 2 0 3 OFF 4 PRES 5 2 6 SENS. LEVEL 1 BOOST ON C Power EXIT Loop Detector PULSE FREQ.
MULTIPLE SAFETY DEVICES CONNECTIONS Multiple SAFETY devices installed together must be connected “in series”. Locate the normally closed (N.C.) dry contact from each accessory relay. Also, before installing the accessory devices, remove the black wire jumper from the SAFETY terminal position on the terminal strip of the control board. Safety wire connections From Accessory #1 to Terminal Strip Relay Com to 24V-COM From Accessory #2 to Terminal Strip Relay N.C.
LEADING EDGE CONNECTION 514 GDE 514 GDE ON BO U BO U ON BO U 3 38 6 RNS 3 38 6 3 38 6 RNS 514 GDE RNS ON 3 1 3 1 3 2200 u 1 514 GDE 514 GDE ON 2200 uF PHILIPS 514 GDE 514 GDE 2200 uF ON PHILIPS ON 00 uF ON 514 GDE ON 514 GDE ON 3 4 5 6 7 514 GDE ON 8 514 GDE ON EDGE ON 2 514 GDE ON GND 514 GDE 1 -----------------------OPEN------------------------ Connect one of the wires from leading edge to GND connector on control board.
PRE-WIRED LOOP INSTALLATION ON SL-150 Model SL-150 provides two pre-wired loop harnesses one for SAFETY LOOP and one for EXIT LOOP. Loop detectors must be 120 VAC. To install loop detectors make sure power is off in main power source then simply plug detector in designated harness socket and wire the ground loop to the grey and brown wires located inside the electrical box behind operator gearbox. There is one pair labeled EXIT for EXIT LOOP and one pair labeled SAFETY for SAFETY LOOP.
EMERGENCY RELEASE For SL-150 Procedures to release gate: 1. Turn power OFF. 2. Push pedal down & move pedal slightly to the left to hold pedal down in position. 3. Push gate open.
THREE BUTTON STATION SYSTEM 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON ON 514 GDE See push button connections below. Terminal strip PED-SW Jumper Connect the COMMON from all the push buttons to 24V- COM on the terminal strip. OPEN N.O. CLOSE Connect OPEN push button N.O. contact to EXIT LOOP on the terminal strip. N.O. STOP COM N.C. Connect CLOSE push button N.O. contact to 3BT on the terminal strip. Connect STOP push button N.C.
MASTER/SLAVE CONNECTION Before connecting master/slave gate operators together, test and adjust the limit switches and the ERDs for each operator as “stand alone” machines. All accessories must be installed on the master board, no exception. See page 49 for dip switch settings. Use a two wire shielded cable and run it through a UL listed conduit for master/slave connection. Follow the wiring diagram as shown below. Master Board Slave Board +.....................Positive to Positive...................+ -.
MAGNETIC/SOLENOID LOCK CONNECTIONS Magnetic lock installation requires a step down transformer with appropriate voltage for the specific lock accessory. AC-N and LOCK from terminal strip supply 110 volts to power the transformer and control the locks’. Connect low voltage wires from transformer directly to the lock as shown below. Only two wires needed for the installation. No relay wires required.
RADIO RECEIVER CONNECTIONS 3 wire receiver mounts on receiver strip outside control box as shown below. 4 wire receiver :connect the two grey wires to 1 & 2 terminals on receiver strip outside control box. Connect black wire to 24 V-COM and red wire to 24VAC on main control board terminal strip as shown below. 514 GDE ON 514 GDE ON 514 GDE ON 514 GDE ON Multi-Code 3 wire 24VAC Radio Receiver 3 = 24V 2 = Relay 1 = Common 3 2 1 Receiver terminal strip located outside control box.
OPEN AND CLOSE ELECTRONIC REVERSING SENSOR(ERDs) ADJUSTMENT Open and Close ERD SENSITIVITY MAX MIN MAX MIN 514 GDE ON 3 3 2200 u 1 RNS BO U BO U BO U BO U ON 1 514 GDE 514 GDE 2200 uF 1 ON 2200 uF ON PHILIPS PHILIPS 3 1 33 86 3 33 86 3 38 6 BO U RNS RNS 3 38 6 3 38 6 RNS 514 GDE RNS 1 3 514 GDE 00 uF ON 514 GDE ON 514 GDE ON 514 GDE 1 ON 2 3 4 5 6 7 514 GDE 8 -----------------------OPEN------------------------ ON 514 GDE ON 514 GDE ON Counter clockw
TIMER ADJUSTMENT TIMER ON: Timer to close, can be set from 1 to 60 seconds. TIMER OFF: Gate operation is push button to open, push button to close. TO OVERRIDE THE TIMER: Turn the RADIO switch to the “ON” position. This will allow the radio receiver to close the gate before the timer. TIMER adjustment 0 60 Sec Sec 0 60 Sec Sec Turn potentiometer counter clockwise for more time. Turn potentiometer clockwise for less time. Timer Pot 60 Sec. 1 Sec.
DIP SWITCH FUNCTIONS OFF 1 2 3 4 5 6 7 TIMER TIMER switch “ON” activates the TIMER. See page 47 for details. RADIO RADIO switch “ON” allows the radio receiver to override the timer. See page 47 for details. OSC OSC switch “ON” allows the radio receiver to stop and reverse the gate in any direction. During a cycle the first signal stops gate, a second signal reverses gate.
ALL-O-MATIC’S good service and high quality by years of, proven reliability place the ALLO-MATIC slide gate operators ahead of the competition. The SL-150 is our highest duty rated operator and the most powerful continuous duty operator available in the market today. The SL-150 has a foot pedal release in the event of a power failure. The SL-100 is our most popular gate operator. It is continuos duty for commercial and residential use. In the event of power failure, the gate can be pushed open.