User guide
12
Left or Right Hand Operation
operator
Gate in closed position
operator
Gate in closed position
Wiring Instructions
STEP 1. Determine which direction the gate will open. The factory units are plugged into INPUT B
for right hand opening as shown in Fig. 1.
For left hand opening, disconnect from INPUT B and plug into INPUT A on the surge
board as shown in Fig. 2.
Fig. 1
Right Hand Opening
Fig. 2
Left Hand Opening
Right Side Installation
Red
Black
Green
Orange
White
Left Side Installation
Red
Black
Green
Orange
White