2.3 Bi-Parting Gates Wiring - Dual Gate Operators
1
Motor
2
Motor
3
Neutral
4
24VAC
5
Limit
6
Spare
7
Limit
8
COM
1
Motor
2
Motor
3
Neutral
4
24VAC
5
Limit
6
Spare
7
Limit
8
COM
Conduit
Secondary Operator Terminal
Conduit
Primary
Operator
Secondary
Operator
Primary Operator Control Board (4405)
• Secondary operator contains
NO control board.
• All loop detector, safety and access control devices
are wired to the primary operator.
Operator
Chassis
Ground
Primary/secondary
interconnection cable
in underground conduit.
AC Power
Connect the Primary/Secondary operators together with DoorKing’s interconnection cable as shown (Different lengths sold
separately P/N 2600-75x). High voltage power and low voltage communications are supplied to the secondary operator by
DoorKing’s UL approved cable that is run in a single conduit. Two conduits (High voltage and low voltage) will need to be
provided to the secondary operator when NOT using DoorKing’s UL listed, wet environment interconnection cable.
(Red) Motor 1 High
(Blue) Motor 2 High
(White) Neutral 3 High
(Purple) 24VAC 4 Low
(Yellow) Limit 5 Low
(Brown) Spare 6 Low
(Orange) Limit 7 Low
(Gray) COM 8 Low
Motor 1 High (Red)
Motor 2 High (Blue)
Neutral 3 High (White)
24VAC 4 Low (Purple)
Limit 5 Low (Yellow)
Spare 6 Low (Brown)
Limit 7 Low (Orange)
COM 8 Low (Gray)
Secondary OperatorPrimary Operator
Interconnection Cable Wiring
SW 1,
switches 1
and 2 will
be opposite
each other.
Switch 6
MUST be
ON, see
page 18.
1
ON
2 3 4 5 6 7 8
DoorKing’s UL Listed (Wet Environment)
Primary/Secondary Interconnection Cable
Primary Operator
8-Pin
Secondary
Interface
Terminal
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SELF
TEST
NC NO
1
2
3
4
5
6
7
8
9
13
12
11
10
14
15
16
17
18
19
20
4405
P
U
S
H
T
O
O
PE
R
A
T
E
t
e
c
h
n
ic
ia
n
u
s
e
o
n
ly
Chassis
Ground
AC power
conduit to primary
operator only.
Optional Heater Installation Note:
If optional heaters are to be installed on
the operators, run two power wires through
the interconnection cable conduit to power the
secondary operator’s heater. Refer to the instruction
sheet with the heater kit for more information.