Manual
Table of Contents
Section 1 – Installation
1.1 Specifications ...........................................................................................................................................15
1.2 Mounting Post / Base Plate Installation
1.2.1 Post Mount Operator................................................................................................................16
1.2.2 Pad Mount Operator.................................................................................................................18
1.3 Mounting the Operator
1.3.1 Post Mounted Operators ..........................................................................................................20
1.3.2 Pad Mounted Operators...........................................................................................................21
1.4 Arm Assembly and Installation
1.4.1 Crank Arm Assembly................................................................................................................22
1.4.2 Connecting Arm........................................................................................................................23
1.4.3 Test the Installation ..................................................................................................................24
1.5 Warning Sign Installation..........................................................................................................................24
1.6 Setup for Gates Opening Other Than 90°
1.6.1 Determine the Location of the Operator...................................................................................25
1.6.2 Arm Length Calculations ..........................................................................................................26
Section 2 – Wiring
Conduits ...................................................................................................................................................27
2.1 High Voltage Connections
2.1.1 Single Operator ........................................................................................................................28
2.2 Control Wiring...........................................................................................................................................29
2.3 Loop Detector Wiring................................................................................................................................30
2.4 Auxiliary Device Wiring.............................................................................................................................31
2.5 Primary / Secondary (Dual) Gate Wiring ..................................................................................................32
2.6 Main Terminal Identification and Description............................................................................................33
2.7 Auxiliary Terminal Identification and Description......................................................................................34
Section 3 – Adjustments
3.1 Circuit Board Adjustments ........................................................................................................................35
3.2 Switch Settings.........................................................................................................................................36
3.2.1 SW 1 (Top Switch) Description and Function...........................................................................37
3.2.2 SW 2 (Bottom Switch) Description and Function .....................................................................37
3.3 Limit Adjustment.......................................................................................................................................38
3.4 Entrapment Sensing System
3.4.1 Clutch Adjustment ....................................................................................................................39
3.4.2 Secondary Entrapment Protection System ..............................................................................39
Page 12 6300-065-E-4-08