Manual
1601-065-G-6-12
1
SPECIFICATIONS 2-3
UL325 Entrapment Protection
Safety Information for Vertical Barrier Arm
4
5
SECTION 1 - INSTALLATION 6
6
7
7
1.1 Underground Conduit Requirements
1.2 New Concrete Pad
1.3 Trenching Existing Concrete
SECTION 2 - WIRING 8
8
8
9
10
11
12
2.1 High Voltage Wire Runs
2.2 High Voltage Terminal Connections
2.3 Dual Gate Operators (Primary/Secondary)
2.4 Main Terminal Description
2.5 Control Wiring
2.6 P.A.M.S. Multiple Gate Operator Sequencing
SECTION 8 - TECHNICAL INSTRUCTIONS 32
8.1 Maintenance Schedule
8.2 Diagnostics Check
8.3 Troubleshooting
8.4 Accessories Parts List
Wiring Schematics
32
33
33-34
35
36-39
SECTION 4 - ARM INSTALLATION 18
4.1 Mounting Hub(s)
4.2 Mounting Arm(s)
4.3 1602 3-Piece Arm Assemblies
18
19
19
SECTION 5 - ADJUSTMENTS 20
5.1 1601 Circuit Board Description and Adjustments
5.2 DIP-Switch SW 1 and SW 2 Settings
5.3 Reverse Arm UP and DOWN Positions
5.4 Magnetic Limit Adjustment
5.5 Reverse Sensor Adjustment
5.6 Manual Operation of the Arm
20
21-23
24
25
25
26
SECTION 6 - OPTIONAL CONVENIENCE OPEN SYSTEM 27
6.1 Operating Mode
6.2 DC System Description
6.3 DIP-Switch Settings
27
28
28
SECTION 7 - OPTIONAL ACCESSORIES INSTALLATION 29
7.1 Contact Sensor (Reversing Edge)
7.2 Fan Kit
7.3 Heater Kit
29
30
31
TABLE OF CONTENTS
SECTION 3 - LOOP DETECTOR LANE SETUPS
13
14
15
16
17
3.1 Entry Lane Only
3.2 Exit Lane Only
3.3 2-Way Traffic Lane
3.4 Ticket Spitter Entry Lane
3.5 Operator Timer ON Entry Lane (No Down Loop)
13