Manual
1601-065-G-6-12
18
CLA
SS
CER
TI
FI
ED
T
O
CA
N
/
C
SA C22.2 NO
. 247
CO
N
FO
R
MS TO
AN
S
I
/
U
L-325
VE
H
ICU
L
A
R
G
AT
E
OP
E
R
A
T
O
R
H
P
53382
MOD
EL
SERI
A
L
VO
LTS
PH
A
SE
AMPS 60 Hz
M
AX GA
T
E LO
AD
DoorKi
n
g,
I
nc
.
,
I
nglewoo
d
,
CA
4.1 Mounting Hub(s)
Hub
Second Hub
Locking
Plate
Bolt
Screw
Horizontal
Vertical
Mount hub(s) as shown with operator in the DOWN position.
A single hub should be mounted on the opposite side of
oncoming traffic.
Hub in the DOWN position.
Arm Direction
Wood bracket holes
(See next page).
Plastic/Aluminum
bracket holes
(See next page).
Horizontal
Arm Direction
Vertical
Arm Direction and Bracket Hole Positions
SECTION 4 - ARM INSTALLATION
Arm installation varies depending on the operator model and individual installation requirements. All operators are equipped
with 2 hub connections on opposite sides of the operator.
The 1601 operates with a single 14 ft. arm (either straight or folding arm). The 1601 can not operate with the 20 ft. to 27 ft.
3-piece arm assemblies.
The 1602 operator is designed for the 3-piece 20 ft. to 27 ft. arm assemblies only.
Hub
Note: If your installation does NOT allow the
arm to mount in this direction, see Section
5.3, (page 24) to reverse factory setup.