Owner manual

Page 11
July, 2006
390 24v Operator And
425 D Control Panel Installation Manual
1
5
3
6
8
2
4
9
7
3
5
1
A
A
B
A
B
C
C
D
A
Figure 1. The layout of a sample gate system
NOTE: Locate activation switches at
least10 ft from the gate.
1 Operator
Wire Gauges for Given Voltage
2 Control Panel/Enclosure
110 VAC primary / 24 VAC 100 VA secondary
3 Photocell A 2 × 18 AWG A 2 × 18 AWG
4 Power Switch B 4 × 14 AWG B 4 × 14 AWG
5 FAAC 5 Wire Cable for Master/Slave Connection and
Junction Box
C 5 × 18 AWG C 5 × 18 AWG
6 Gate stops provided by built in limit switch
7 FAAC Key Activated Switch (T10) A 2 × 18 AWG A 2 × 18 AWG
8 Wiring to main circuit breaker D
6
7
8
2 × 12 AWG