User Manual
Page 11
May, 2006
415 L LS Operator And
455 D Control Panel Installation Manual
1
5
3
6
8
2
4
9
7
3
5
1
A
A
B
A
B
C
C
D
A
Figure 14. The layout of a sample gate system
NOTE: Locate activation switches at
least10 ft from the gate.
6
7
8
Operator
Wire Gauges for Given Voltage
Control Panel/Enclosure
115 VAC
Photocell A 2 × 18 AWG A 2 × 18 AWG
Power Switch B 4 × 14 AWG B 4 × 14 AWG
FAAC 5 Wire Cable for Master/Slave
Connection and a Junction Box
C 5 × 18 AWG C 5 × 18 AWG
Gate stops See Page 6 for further details on positive stop explanation
FAAC Key Activated Switch (T10) A 2 × 18 AWG A 2 × 18 AWG
Wiring to main circuit breaker D
1
2
3
4
5
6
7
8
2 × 12 AWG