Installation Instructions
EZ Handrail Installation Step 3
8. Align the top cap (E) with your top snap making sure one end is flush.
Starting at one end, squeeze the top cap and top snap together until it pops
in place. Continue snapping down the top cap until reaching the end of your
railing.
9. Slide the top post mounts (F) and bottom post mounts (G) over the ends of
your railing (4 mounts total).
10.
Place assembled railing section between posts.
If the handrail section
needs to be shortened, CUT EQUAL LENGTHS FROM BOTH ENDS OF
THE RAILING. Example: If the railing is 3 inches to long, take 1 ½ inches
off each end.
G
E
D
A
B
E
F
G
Optional Contractor Post
E
F
D
6
Step
3
2
”
-
6
Step
3
www.Contractorhandrail.com (for installation Video)
(Ordered separately)
Key
A. Bottom Channel
B. Picket
C. 1 1/2” Fasteners
D. Top Snap
E. Top Cap
F. Top Post Mount
G. Bottom Post Mount