User manual
The PCB completely equipped
Next, solder on the matching wire pieces for the two potis. For their lengths, see
the wiring plan. Either push the wire ends through the holes and solder them on
like the remaining components, or solder them to the solder areas flat. The PCB
should be installed suspended between the two potis. It is held by six wires.
Additionally, one wire runs to the volume poti switch and two to the amplifier.
The black battery compartment wire must be connected to the GND connection.
The red connection leads to the volume controller switch. The remaining wire
should be soldered to the aerial connection. If this connection wire is longer
than required, this will improve reception by increasing the effective aerial
length.
The wiring plan
11