Users Manual

Page | 29
TERMINATE THE FIELD WIRING
1. Verify the wiring is clear of faults using suitable metering equipment.
2. Pull the wiring into the junction box.
3. Connect the field wiring to the terminals as shown in FIGURE 21 and tighten to the
values shown in TABLE 3 below.
FIGURE 21
TABLE 3
FIELD WIRING TORQUE VALUES
Wire size (AWG) Torque value
14-10
8
6-4
3
4. Attach the junction box cover using the Philips screws provided. Tighten until the
lid bottoms out on the base so the gasket is fully compressed. Torque to 5 in/lbs.
i
NOTE USE A TORQUE DRIVER TO TIGHTEN THE SCREWS TO 5 IN/LBS.