Users Manual

Page | 22
PLACE THE CONNECTDER IN THE METER SOCKET
1. Confirm the ConnectDER circuit breaker is in the open (OFF) position.
2. Be certain to install the ConnectDER in the proper orientation. The field wiring
terminals are at the top of the device and the circuit breaker is at the bottom.
3. Insert the ConnectDER into the meter socket ensuring any wire or added
terminations are prevented from contacting non-insulated live parts within the
existing meter socket as shown in FIGURE 13.
4. Make sure that all contacts are seated in the meter socket jaws. This is especially of
concern in older meter sockets with loose and slightly misaligned jaws.
FIGURE 13