Operating instructions
8 / 16
EN-TraceTekTTTS12-IM-H8085601/15
THERMAL BUILDING &
INDUSTRIAL HEAT TRACING SOLUTIONS
REINSTALL BACK PLANE ASSEMBLY AND WIRE HARNESS
MAKING CONNECTIONS:
1. Re-install the back plane assembly by reversing the removal procedures.
2. Reinstall the four bolts that secure the back plane assembly.
3. Restore wire harness connectors on back of TT-TS12 touchscreen.
4. Slip wire harness into wire harness holders on door and left side of enclosure. Snap wire harness holders closed.
5. Check for interference by carefully opening and closing the door and adjust wire harness position if necessary
CAUTION:
1. Assure branch circuit to TT-TS12 has been de-energized prior to working with line voltage wiring.
Connect mains power wires (100- 240 Vac 50/60 Hz) and ground to the terminal blocks in the lower right corner. There is no
preferred position for line or neutral. Maximum conductor size is 10 AWG (4.5 mm). Connect ground wire (if provided) to yellow/
green terminal block. See picture below.