FINAL INSPECTION:
Check for:
• No metal filings or other foreign materials present (vacuum or blow out)
• Back plane assembly hold down bolts are tight
• Mounting hardware tight
• Conduit or cable glands tightened
• All screw connections at terminal blocks snug (do not over tighten smaller screw terminals)
• All wires routed such that the door opens and closes freely
• All wire duct covers replaced
• Leader cables from sensor circuits identified
• Generally neat and organized appearance
• Fuses installed in terminal block fuse holders at mains power connection point (lower right corner of back plane assembly)
APPLY POWER:
Ensure that fuse holders at mains power connection terminal block are properly seated. Apply mains power at circuit breaker panel.
(Note that the fuses in the TT-TS12-Panel mains power connection terminal block are designed to act as local disconnect for panel
servicing).
Observe any installed TTSIM units for successful power on indications:
• TTSIM-1 indication is a red LED that blinks once every 10 seconds to indicate power and CPU activity
• TTSIM-1A has a green power on LED that blinks once every 5 seconds to indicate power and CPU activity.
CLOSE AND SECURE THE DOOR LATCH:
Observe the front screen of the TT-TS12 touchscreen for boot-up sequence. This process will take about 1 minute and the screen
may go dark or appear to pause for several seconds from time to time during a normal start-up. Proper start up is indicated by a
screen like that shown below, however the number and type of TTSIM may be different than what is shown in this example.