Instruction manual
TACHPAK 10 & 30 Explosion Proof and NEMA 4X are shipped in a single 
carton containing one rated enclosure and one boxed instrument as described 
above. 
2.2.  Unpacking 
Caution! : TACHPAK and TACHTROL are precision instruments. 
Although they are designed to withstand the rigors of industrial use, 
excessive physical shock or vibration can cause damage. Handle 
carefully. Do not drop or subject to physical extremes.
1.Place the carton on a level surface in a well-lighted area and open the top. 
2. Carefully lift out the instrument and separate from any extraneous packing 
material. 
3. Remove all instrument related materials 
4. Inspect for damage 
3.  Mounting and Wiring Procedures 
3.1.  Installation and wiring guidelines 
•  Locate instrument away from sources of water, heat, humidity, and dust or 
provide a suitable enclosure to protect it from these elements. 
•  Locate the instrument away from sources of electrical noise such as , but not 
limited to: SCRs, triacs, buzzers, horns, motors, welding equipment, 
contactors, heavy current relays, and other noise generating electrical 
equipment. 
•  Use a grounded metal enclosure to protect the instrument from radiated 
electrical noise and other magnetic influences. 
•  Separate low voltage signal and control wiring from switching and power 
wiring. Plan cabinet and panel wiring so that power and relay wiring are 
dressed to one side and low-level signals are dressed to the other. Plan wiring 
to maintain separation at entry to, and egress from the enclosure. 
4










