Technical data

Download, testing and diagnostics
CPU 317T: Technology Functions
8-36 A5E00251798-03
8.9 Testing with the control panel
8.9.1 Introduction - Control panel
The control panel is used to control and monitor individual axes and drives. You
can use it to move drives or axes. It allows the commissioning engineer to
test each part of the installation individually before he initiates programdriven,
coordinated axis motions
test under error conditions whether individual axes can be operated at all from
the control panel, or whether this function is affected by the error
"Release run": Move the axis quickly and independently of the program to
another position.
traverse axes for controller optimization purposes
perform active homing
position relative / absolute
set and remove the axis enable
initiate an axis reset
adjust the absolute value encoder by adding the absolute value encoder offset
("Homing" dialog box)
Note
While the control panel is active and S7T Config has control priority, only
configuration data that become immediately active can be changed.
If configuration data that require a RESTART are changed, control priority must be
returned beforehand. The control priority must be requested again after the
RESTART
!
Warning
Use the axis control panel only in the commissioning or testing phases.